Client: Formal Investments Limited
Value: £4.5 million
Start Date: July 2012
Architect: Think Architecture
Contractor: Clegg Construction
Completed: November 2014
Services: Structural Engineering
Read more…
Redevelopment and refurbishment of an existing office building to provide 37,500 sq ft of flexible Grade A working space. The existing building was completely refurbished and curtain walling installed to increase natural daylight to the offices.
A two-storey extension was also added, creating a new top floor. For this we developed an alternative structural design strategy. This removed the requirement for a variety of strengthening works and made savings to the contract value. Also, a full REVIT model was developed with the steel fabricator for the new steel framed extension, which included a number of complex shapes.
Close…
Client: Formal Investments Limited
Value: £4.5 million
Start Date: July 2012
Architect: Think Architecture
Contractor: Clegg Construction
Completed: November 2014
Services: Structural Engineering
Read more…
Redevelopment and refurbishment of an existing office building to provide 37,500 sq ft of flexible Grade A working space. The existing building was completely refurbished and curtain walling installed to increase natural daylight to the offices.
A two-storey extension was also added, creating a new top floor. For this we developed an alternative structural design strategy. This removed the requirement for a variety of strengthening works and made savings to the contract value. Also, a full REVIT model was developed with the steel fabricator for the new steel framed extension, which included a number of complex shapes.
Close…
Client: Formal Investments Limited
Value: £4.5 million
Start Date: July 2012
Architect: Think Architecture
Contractor: Clegg Construction
Completed: November 2014
Services: Structural Engineering
Read more…
Redevelopment and refurbishment of an existing office building to provide 37,500 sq ft of flexible Grade A working space. The existing building was completely refurbished and curtain walling installed to increase natural daylight to the offices.
A two-storey extension was also added, creating a new top floor. For this we developed an alternative structural design strategy. This removed the requirement for a variety of strengthening works and made savings to the contract value. Also, a full REVIT model was developed with the steel fabricator for the new steel framed extension, which included a number of complex shapes.
Close…
Client-side cookies are used to verify the login status of customers using products or services linked directly with our website. Usage of a cookie is in no way linked to any personally identifiable information while on our site. If you reject the cookie, you may still use our site; however, you may not be able to access all areas of our site. Learn more.