Client: Department of Home Affairs - Isle of Man Government
Value: £35m
Architect: IBI Taylor Young
Completion: August 2007
Services: Structural Engineering
Read more…
This Category B prison facility, providing a 140 cell facility, is surrounded by 5.2m high precast concrete perimeter walls. The only interruption to the secure perimeter is the two-storey Gatehouse building. Within the secure perimeter there are numerous buildings including a workshop, five wing blocks, a central hub area, kitchens, educational and recreational buildings.
Structural steelwork was the preferred construction material for the majority of buildings, although the wing blocks were designed with precast reinforced concrete, delivered to site as flat packs assembled on site using insitu concrete stitches.
Close…
Client: Department of Home Affairs - Isle of Man Government
Value: £35m
Architect: IBI Taylor Young
Completion: August 2007
Services: Structural Engineering
Read more…
This Category B prison facility, providing a 140 cell facility, is surrounded by 5.2m high precast concrete perimeter walls. The only interruption to the secure perimeter is the two-storey Gatehouse building. Within the secure perimeter there are numerous buildings including a workshop, five wing blocks, a central hub area, kitchens, educational and recreational buildings.
Structural steelwork was the preferred construction material for the majority of buildings, although the wing blocks were designed with precast reinforced concrete, delivered to site as flat packs assembled on site using insitu concrete stitches.
Close…
Client-side cookies are used to verify the login status of customers using products or services linked directly with our website. Usage of a cookie is in no way linked to any personally identifiable information while on our site. If you reject the cookie, you may still use our site; however, you may not be able to access all areas of our site. Learn more.