Curtins were employed by the CEGB (Central Electricity Generating Board) to design the foundations to a group of CO2 tanks that were built at Sizewell B nuclear power station in 1986.
We worked on the design of the foundations to new CO2 tanks. These foundations were designed to accommodate seismic loading.