This is a major Design and Build urban regeneration scheme involving the demolition of existing medium rise concrete framed housing which sit, in part, over a basement car park.
The construction consists of a concrete frame for the majority of this £23 million scheme, with low level timber frame units in other areas of the site. Various concrete solutions were considered including post tensioned flat slabs.