factory-2050-university-of-sheffield-1.jpg

Factory 2050 University of Sheffield

This 6,730m2 factory is a state-of-the-art reconfigurable assembly and component manufacturing facility for collaborative research and development.

Higher Education - Yorkshire

Project Overview

This 6,730m2 factory is a state-of-the-art reconfigurable assembly and component manufacturing facility for collaborative research and development.

The new research factory is designed to meet the future needs of aerospace and other high-value manufacturing industries. It combines a range of technologies, including advanced robotics, flexible automation and new programming and training tools.

The facility has a total area of around 4,500 sqm and consists of three distinct areas: The drum is the UK's first constant and circular production line for researching and teaching innovative manufacturing technology. A 63m radii circular hub which includes an 800mm thick reinforced concrete floor slab to the manufacturing areas with a circular radial crane above. The hub has been designed to be flexible for future manufacturing. Linked to the hub via a glazed transition space is The Wing - an assembly building for developing aeronautical technologies. A straight single-storey building big enough for researchers to work on the wings of some of the world’s largest passenger aircraft.

And finally, The hub is a three-storey office, education and conference facility. The building is almost entirely enclosed in a glass skin, allowing visitors to observe the advanced manufacturing technologies being developed within the open-plan workshop.

Services we provided:

  • Civils & StructuresCivils & Structures

We worked with:

Architect: Bond Bryan

Contractor: Tilbury Douglas

Share Project

The Challenge

With collaboration, development and building lifespan in mind, the facility needed to be designed to allow for future flexibility.

Factory 2050 is located on the Sheffield Business Park which was formerly used as the Sheffield City Airport and has a history of opencast mining along with several railway cuttings beneath the site that created several geotechnical challenges.

Our Solution

We undertook a detailed site investigation and conceptualised geotechnical model in order to undertake a foundation appraisal for the manufacturing facility – a facility that required tight tolerances on the floor slab design. We opted for a raft slab foundation, removing the requirement for piles, whilst also providing future flexibility for fixing down future processes to the floor.

Our design comprised a 800mm thick reinforced concrete floor slab in the manufacturing areas that allowed for the open plan layout and future flexibility.

Our use of BIM technology in partnership with the wider design team enabled the project to proceed from Work Stage 3 to Work Stage 5 in only six weeks. Curtins were pivotal in driving this process forwards and were recognised as the differentiator in achieving this rapid process which enabled the project to proceed.

factory-2050-university-of-sheffield-1.jpg
factory-2050-university-of-sheffield-1.jpg
factory-2050-university-of-sheffield-1.jpg

Awards

  • Project of the Year - Constructing Excellence Yorkshire & Humber Awards

  • Highly commended for Health & Safety category - Constructing Excellence Yorkshire & Humber Awards

Factory 2050 University of Sheffield

Similar Projects

Healthcare Relocation Cardiff University
Higher Education

The retrofitting of this existing building has seen Cardiff University’s School of Healthcare Sciences located to a single site for the first time since its inception.

Cardiff University Healthcare Relocation

Sir William Henry Bragg Building,
Higher Education

A landmark development for engineering and physical sciences, and the largest single project the university has undertaken since the 1960s.

Sir William Henry Bragg Building, University of Leeds

Nucleus Building, University of Edinburgh
Higher Education

A Hub for the Kings Buildings Campus and forms the primary element in the redevelopment of the Campus site. The building accommodates a mixture of lecture theatres, cafe/dining, study and laboratories over 4 levels.

Nucleus Building, University of Edinburgh

Mount Oswald, Durham University
Higher Education

Construction of two distinct colleges for John Snow and 17th Colleges within the University, comprising 1000 bed spaces, two college heart buildings, and a hub building with formal dining facilities.

Mount Oswald, Durham University

factory-2050-university-of-sheffield-1.jpg
Higher Education

This 6,730m2 factory is a state-of-the-art reconfigurable assembly and component manufacturing facility for collaborative research and development.

Factory 2050 University of Sheffield

Jeffrey Cheah Biomedical Centre
Higher Education

A high research laboratory for the University of Cambridge to establish a new centre of excellence for the development of medical treatments.

Jeffrey Cheah Biomedical Centre

Contact Curtins

Let’s talk about your next project and how our experienced team can help

Find your nearest Curtins office

Contact