The reuse of the existing 1970’s concrete
frame to extend the buildings floor area and
add two extra storeys, creating new offices and
floor level retail units.
The existing concrete waffle slabs required
carbon fibre strengthening, while the additional
storeys and new extension were constructed
using steel frame and precast concrete floor
units.