    Construction of a new modular Critical Care Unit
    within the existing hospital site. The new two storey
    unit provides a 12 bed critical care ward with a
    single isolation room on the ground floor.

    Located between two operational wards, the
    sequence of works needed to be planned to
    minimise disruption to the hospital operations.
    Additionally, the tight programme dictated that a
    modular build presented the only viable option to
    ensure the new facility was operational within the
    required timescales.

    The Integrating Health Services programme
    of works at Royal Stoke Hospital was highly
    commended in the Innovation in Procure 21+
    category at the Building Better Healthcare Awards
    2015.

    Close…

  • Critical Care Unit, Royal Stoke University Hospital

    Client:University Hospitals of North Midlands NHS
    Trust (UNHM) / Kier
    Value: £12m

    Read more…

    Construction of a new modular Critical Care Unit
    within the existing hospital site. The new two storey
    unit provides a 12 bed critical care ward with a
    single isolation room on the ground floor.

    Located between two operational wards, the
    sequence of works needed to be planned to
    minimise disruption to the hospital operations.
    Additionally, the tight programme dictated that a
    modular build presented the only viable option to
    ensure the new facility was operational within the
    required timescales.

    The Integrating Health Services programme
    of works at Royal Stoke Hospital was highly
    commended in the Innovation in Procure 21+
    category at the Building Better Healthcare Awards
    2015.

    Close…

  • Critical Care Unit, Royal Stoke University Hospital

    Client:University Hospitals of North Midlands NHS
    Trust (UNHM) / Kier
    Value: £12m

    Read more…

    Construction of a new modular Critical Care Unit
    within the existing hospital site. The new two storey
    unit provides a 12 bed critical care ward with a
    single isolation room on the ground floor.

    Located between two operational wards, the
    sequence of works needed to be planned to
    minimise disruption to the hospital operations.
    Additionally, the tight programme dictated that a
    modular build presented the only viable option to
    ensure the new facility was operational within the
    required timescales.

    The Integrating Health Services programme
    of works at Royal Stoke Hospital was highly
    commended in the Innovation in Procure 21+
    category at the Building Better Healthcare Awards
    2015.

    Close…