• New College Doncaster

    Client: BAM Construction
    Value: £20 million
    Architect: Ryder Architecture
    Contractor: BAM Construction
    Completed: September 2017
    Services: Civil & Structural; Environmental; Infrastructure/Drainage

    Read more…

    New College Doncaster is a 9,450sqm sixth
    form college with individual learning zones
    based around a multi-functional hub.

    The project is steel framed with suspended
    precast floors to form the upper stories and
    lateral restraint is provided by braced bays at
    core locations. A traditional pad foundations
    solution is used.

    The site is poorly serviced by surface water
    and foul water connections. Extensive
    soakaway tests were undertaken to ensure
    all surface water is kept on site and created a
    new foul water network which discharges the
    foul water into the managed network.