Elevate Quarter, Stevenage
Positioned beside GSK’s Stevenage hub, this 33-acre life sciences campus pioneers flexible, sustainable design for global biotech demand. Phase 1 delivers key infrastructure and R&D buildings with advanced SuDS for resilient, eco-conscious development. A bold leap in scientific innovation, engineered to evolve with the breakthroughs it will empower.
Science & Technology - The South, England
- Home
- Our Experience
- Elevate Quarter, Stevenage
Project Overview
The project involves the development of a renowned global research and development (R&D) life sciences campus aimed at meeting the growing demand for state-of-the-art commercial and laboratory space, from emerging and established life science firms.
The site is located north of the existing GSK R&D in Stevenage spread over 33 acres. The project would deliver a mix of low to medium rise multi-storey buildings and diverse landscape spread across the campus with key design emphasis on sustainability, innovation, and specific end user requirements.
The project masterplan consists of a phased approach across the site to construct 15 R&D buildings, 3 Multi-storey Car parks, a Central Hub building and a central Utility Building and Energy Hub (Substation). The current plan is to subdivide these into 3 phases with the Phase 1 consisting of the site wide masterplan with associated landscape and civil works, 2 R&D buildings, 1 Car Park and the Substation.
The Challenge
To deliver a flexible, future-ready life sciences campus with low- to mid-rise multi-storey buildings that meet cutting-edge R&D needs while placing sustainability, climate resilience, and user-centric design at the forefront. The site also required careful civil planning due to its scale, phased development, and infrastructure demands.
Our Solution
Implemented a comprehensive Sustainable Drainage System (SuDS) strategy that incorporates soakaways and infiltration devices to naturally manage surface water runoff. This low-impact, sustainable approach reduces flood risk, improves water quality, and supports the project’s environmental goals. The solution was integrated into the phased masterplan to ensure long-term adaptability and minimal ecological disruption across all stages.

Key Points
• Carbon Reduction
• Sloping site
• Aiming for BREEAM Excellence
• Health & Wellbeing
• Phased Development
Our Approach To...