Elevate Quarter

Elevate Quarter, Stevenage

Positioned beside GSK’s Stevenage hub, this 33-acre life sciences campus pioneers flexible, sustainable design for global biotech demand. Phase 1 delivers key infrastructure and R&D buildings with advanced SuDS for resilient, eco-conscious development. A bold leap in scientific innovation, engineered to evolve with the breakthroughs it will empower.

Science & Technology - The South, England

Project Overview

The project involves the development of a renowned global research and development (R&D) life sciences campus aimed at meeting the growing demand for state-of-the-art commercial and laboratory space, from emerging and established life science firms.

The site is located north of the existing GSK R&D in Stevenage spread over 33 acres. The project would deliver a mix of low to medium rise multi-storey buildings and diverse landscape spread across the campus with key design emphasis on sustainability, innovation, and specific end user requirements.

The project masterplan consists of a phased approach across the site to construct 15 R&D buildings, 3 Multi-storey Car parks, a Central Hub building and a central Utility Building and Energy Hub (Substation). The current plan is to subdivide these into 3 phases with the Phase 1 consisting of the site wide masterplan with associated landscape and civil works, 2 R&D buildings, 1 Car Park and the Substation.

Services we provided:

  • Civils & StructuresCivils & Structures

Client:

Reef Group

Share Project

The Challenge

To deliver a flexible, future-ready life sciences campus with low- to mid-rise multi-storey buildings that meet cutting-edge R&D needs while placing sustainability, climate resilience, and user-centric design at the forefront. The site also required careful civil planning due to its scale, phased development, and infrastructure demands.

Our Solution

Implemented a comprehensive Sustainable Drainage System (SuDS) strategy that incorporates soakaways and infiltration devices to naturally manage surface water runoff. This low-impact, sustainable approach reduces flood risk, improves water quality, and supports the project’s environmental goals. The solution was integrated into the phased masterplan to ensure long-term adaptability and minimal ecological disruption across all stages.

Elevate Quarter

Key Points

• Carbon Reduction

• Sloping site

• Aiming for BREEAM Excellence

• Health & Wellbeing

• Phased Development

Complete Services

Windmill Green

Insite

Learn More

Curtins’ bespoke Insight service helps clients maintain the structural safety of existing buildings and confidently plan for their forward use

Foursite

Foursite

Learn More

Our innovative approach to due diligence, pre-planning and other development services.

Ecofurbishment

Ecofurbishment

Learn More

Our economical remodelling of existing buildings to ensure they can reused or retrofitted in a sustainable, continuous loop.

White City Central London

Masterplanning

Learn More

Strategically delivering city masterplans and phased developments

Our Approach To...

Windmill Green

Insite

Learn More

Curtins’ bespoke Insight service helps clients maintain the structural safety of existing buildings and confidently plan for their forward use

Foursite

Foursite

Learn More

Our innovative approach to due diligence, pre-planning and other development services.

Ecofurbishment

Ecofurbishment

Learn More

Our economical remodelling of existing buildings to ensure they can reused or retrofitted in a sustainable, continuous loop.

White City Central London

Masterplanning

Learn More

Strategically delivering city masterplans and phased developments

Similar Projects

Hemisphere, Liverpool
Science & Technology

Hemisphere represents a defining moment in the regeneration of Liverpool’s Knowledge Quarter, bringing forward a bold and sustainable new landmark shaped by the city’s architectural legacy.

Hemisphere, Liverpool

Nucleus Building, University of Edinburgh
Higher Education

A Hub for the Kings Buildings Campus and forms the primary element in the redevelopment of the Campus site. The building accommodates a mixture of lecture theatres, cafe/dining, study and laboratories over 4 levels.

Nucleus Building, University of Edinburgh

Pentre Awel
Healthcare

Pentre Awel is the first development of its scope and size in Wales providing world-class medical research and health care delivery and supporting and encouraging people to lead active and healthy lives.

Pentre Awel (Phase 1), Llanelli

Micheal Uren Building London
Higher Education

This research hub forms part of Imperial College London’s White City Campus housing flexible accommodation for biomedical sciences and engineering.

Michael Uren Biomedical Engineering Research Hub, London

London Institute of Medical Sciences
Higher Education

The LIMS building has been constructed on the constrained Hammersmith Hospital Campus to provide state-of-the-art laboratories.

London Institute of Medical Sciences

Health & Wellbeing Academy, Southgate2
Higher Education

Forming part of the Southgate masterplan, the University of Huddersfield’s Southgate Building 2 is the second addition to the wider National Health Innovation Campus and will offer 6,000 m2 of teaching and NHS diagnostic space across five storeys.

Health & Wellbeing Academy, Southgate 2

Contact Our Offices

Let’s talk about your next project and how our experienced team can help

Find your nearest Curtins office

Contact