Ysgol Llyn Forwyn

Ysgol Llyn Forwyn

A new 270 place Primary School, located on the Former Chubb Fire and Security Site. The site has a number of constraints, which required early engagement with the client and stakeholders, in order to maximise the sites opportunity.

Schools & Further Education - Wales

Project Overview

On the site of a former ‘Chubb’ factory, we have helped to deliver a new primary school in Fernale as part of a multi-million pound community investment.

The school offers modern facilities for 270 pupils and includes a 30-place Cylch Meithrin, a Multi Use Games Area, grass sports pitch, external play areas, and car parking.

The site has a number of constraints, which required early engagement with the client and stakeholders, in order to maximise the sites opportunity. 

The site suffered with significant amount of contamination on site, including very challenging contaminated ground water.  Curtins expertise were instrumental in developing a remediation strategy that satisfied NRW and the CLO, securing a Planning consent on a site, which had failed on numerous previous schemes.

The site had a number of constraints including challenging topography, existing DCWW assets running through the site, and difficult outfalls.  Early engagement with DCWW allowed easements and diversion routes to be agreed, which were fundamental in developing the scheme proposals for the site.  In addition, due to challenging outfalls and the SAB request for requiring better than green field run-off rates, early hydraulic modelling of the network was required in RIBA 2, which was critical to save space by ensuring the attenuation was kept as efficient as possible.

The SuDS strategy maximises green infrastructure to boost the biodiversity and amenity value of the site.  The SuDS management train provides raingardens and ponds that are integrated into the landscaping concept, as well as rainwater harvesting being a key feature of the SuDS, promoting water re-use in the school. 

The school is designed to be operationally net zero, with a focus on Passivhaus details and a fabric first approach.  Curtins worked with the team to identify structural solutions that not only supported this fabric first approach, but also minimised the embodied carbon in the structure. 

Copyright of images: Wynne Construction

Services we provided:

  • Civils & StructuresCivils & Structures
  • Geotechnical & Environmental Geotechnical & Environmental

Client:

Rhondda Cynon Taf County Borough Council

We worked with:

Wynne Construction | Contractors

Share Project

The Challenge

Previous schemes failed to secure planning consent, creating a hurdle for new development.

Our Solution

Early discussions and engagement with DCWW helped in agreeing on easements and diversion routes essential for scheme development.

Environmental at Ysgol Llyn Forwyn

Environmental and Geotechnical Services

Before our civils and structures teams provided engineering for the new buildings, our environmental and geotechnical teams were onsite early in the project’s development.

The location of the new school was an industrial site where manufacturing of fire fighting equipment had taken place. Industrial legacy left a groundwater contamination issue that needed addressing with new emergent contaminants knows as PFAS (Per/Polyfluoroalkyl Substances) or ‘forever chemicals’ as well as chlorinated solvent contamination. Extensive ground investigation, assessment and modelling work required to get this site to a developable stage.

In addition to a Phase 2 ground investigation and interpretation services, our teams provided a Foundation Risk Assessment, Remediation Strategy development and specialist Remediation Contractor engagement, as well as overall monitoring and subsequent verification of all remediation work.

We also undertook a comprehensive ground investigation strategy. During this process, there were regulatory concerns surrounding potential mobilisation of contamination as well as vapour risk and ground gas. Through our investigations, we were able preserve the development timeline to ensure the school was operational from September 2024.

Ysgol Llyn Forwyn

Complete Services

Windmill Green

Insite

Learn More

Curtins’ bespoke Insight service helps clients maintain the structural safety of existing buildings and confidently plan for their forward use

Foursite

Foursite

Learn More

Our innovative approach to due diligence, pre-planning and other development services.

Ecofurbishment

Ecofurbishment

Learn More

Our economical remodelling of existing buildings to ensure they can reused or retrofitted in a sustainable, continuous loop.

White City Central London

Masterplanning

Learn More

Strategically delivering city masterplans and phased developments

Our Approach To...

Windmill Green

Insite

Learn More

Curtins’ bespoke Insight service helps clients maintain the structural safety of existing buildings and confidently plan for their forward use

Foursite

Foursite

Learn More

Our innovative approach to due diligence, pre-planning and other development services.

Ecofurbishment

Ecofurbishment

Learn More

Our economical remodelling of existing buildings to ensure they can reused or retrofitted in a sustainable, continuous loop.

White City Central London

Masterplanning

Learn More

Strategically delivering city masterplans and phased developments

Similar Projects

Pontllanfraith
Schools & Further Education

The refurbishment of Pontllanfraith Comprehensive School’s Grammar Block created a dedicated facility for vulnerable learners while boldly reducing embodied carbon through the reuse of 35 tonnes of structural steel in the new sports hall.

Pontllanfraith CVL, Wales

Ysgol Robert Owen
Schools & Further Education

This £22m replacement school for Ysgol Cedewain includes purpose built state-of-the-art facilities including a hydrotherapy pool, sensory and physiotherapy rooms.

Ysgol Robert Owen, Powys

Earth Trust Lab, Oxfordshire
Schools & Further Education

A new-build Visitor Centre with internal and external spaces to educate local school children and day trip visitors.

Earth Trust Lab, Oxfordshire

Cwm Gwyddon Primary School
Schools & Further Education

We constructed a new primary school facility at the site of the former Cwmcarn High School, Cwmcarn and introduced an effective low-maintenance SuDs solution.

Cwm Gwyddon Primary School

Boclair Academy, East Dunbartonshire, Glasgow
Schools & Further Education

This mulit-phased project involed the construction of a two storey building on a live school site, within a residential area

Boclair Academy, East Dunbartonshire, Glasgow

Strawberry Fields, Liverpool
Arts & Culture

A 1,320m² visitor and training centre at Strawberry Field, in Liverpool – the former Salvation Army children’s home made famous by The Beatles.

Strawberry Fields, Liverpool

Contact Our Offices

Let’s talk about your next project and how our experienced team can help

Find your nearest Curtins office

Contact