Boclair Academy, East Dunbartonshire, Glasgow

Boclair Academy, East Dunbartonshire, Glasgow

This mulit-phased project involed the construction of a two storey building on a live school site, within a residential area

Schools & Further Education - Scotland

Project Overview

The new Boclair Academy involves the provision of a new two-storey school building within the grounds of the existing school on Inveroran Drive in Bearsden, Glasgow. This provides state-of-the-art facilities for 1,050 pupils, comprising a large entrance atrium, flexible teaching zones, performance spaces and dining areas. This new secondary school aligns with Scot Gov LEIP policies. Procured through Scape, The Concept Design phase concentrated heavily on the location of the new school with primary attention given to not compromising existing escape routes, providing safe pedestrian access and minimising school operations during the construction phase. This helped with the coordination of a live school environment during construction. Dealing with surface water drainage and connection to foul drainage at the higher level created a series of engineering challenges.

Key Points:

  • Live school environment within a residential area

  • Multi-phased project

  • Constrained site

  • Finished ahead of time

Images copyright David Cadzow

Services we provided:

  • Civils & StructuresCivils & Structures

Client:

East Dunbartonshire Council

We worked with:

Architect: Ryder Architecture
Contractor: McLaughlin & Harvey

Share Project

The Challenge

The project provides a series of challenges including the site topography where the design has incorporated a 4m level change across the footprint of the school. 

Our Solution

This has offered the Design Team the opportunity to introduce a number of dynamic and exciting circulation spaces within the central part of the school, which benefit from a profusion of natural light into the core of the building.

Similar Projects

Earth Trust Lab, Oxfordshire
Schools & Further Education

A new-build Visitor Centre with internal and external spaces to educate local school children and day trip visitors.

Earth Trust Lab, Oxfordshire

Boclair Academy, East Dunbartonshire, Glasgow
Schools & Further Education

This mulit-phased project involed the construction of a two storey building on a live school site, within a residential area

Boclair Academy, East Dunbartonshire, Glasgow

Strawberry Fields, Liverpool
Arts & Culture

A 1,320m² visitor and training centre at Strawberry Field, in Liverpool – the former Salvation Army children’s home made famous by The Beatles.

Strawberry Fields, Liverpool

St Keyna Primary School
Schools & Further Education

A Passivhaus extension to the existing school, doubling the capacity of pupils.

St Keyna Primary School

Campus Whiteheaven
Schools & Further Education

Design and construction of a new high school and leisure facilities in Whitehaven, bringing together St Benedict’s Catholic High School and Mayfield Special School on the existing St. Benedict’s site.

Campus Whiteheaven

Lingey House Primary School, Gateshead
Schools & Further Education

A school built on the site of the existing Lingey House Primary School whilst it remained operational.

Lingey House Primary School, Gateshead

Contact Curtins

Let’s talk about your next project and how our experienced team can help

Find your nearest Curtins office

Contact