Platform 21, Birmingham

Platform 21, Birmingham

Refurbishment and extension of the old Charters Building at 102 New Street to provide 112000sqft of CAT A offices

Workplaces - The Midlands, England

Project Overview

Previously known as The Charters this building was originally designed for Woolworths in the 1960s, and has been imaginatively retrofitted into a modern new business location for 1,500 people.

We provided Civil and Structural Engineering services on this live refurbishment project. The brief was to provide Cat A offices with a large reception lobby an area to accomodate four lifts. The site was confined by a bustling high street, a picturesque arcade, a new metro line and with tenants occupying multiple storeys.

Images courtesy of Wates Construction.

Services we provided:

  • Civils & StructuresCivils & Structures

Client:

Evenacre

We worked with:

Architect: Associated Architects
Contractor: Wates

Share Project

The Challenge

Part of the brief was to create four new lift cores to provide harmonised vertical movement through an otherwise incoherent space.

Our Solution

The ground floor was reconstructed to form a grand entrance lobby and the upper floors extended along Stephenson Street to provide a more modern and aesthetically pleasing elevation. The existing central void was infilled to create a more functional floor plate

Platform 21
highlight

Project Highlights

Complete remodeling of the Stephenson Street Façade

  • Complex terracotta panel/ curtain wall system

  • New double height grand reception area including a hung walkway

  • Addition of three storeys of office space with few strengthening works

  • Conversion of existing wall climber lift and Façade replacement along New Street

  • Accommodation of completely New M&E services within a confined existing structure

  • Live environment

Complete Services

Ecofurbishment

Ecofurbishment

Learn More

Similar Projects

Brent Cross Plot 14
Mixed Use Regeneration

Curtins is supporting Related Argent on Brent Cross Town, a major new neighbourhood in North London. Built using the hyTower structural system, Plot 14 comprises three mixed-use residential buildings of up to 12 storeys, providing 286 build-to-rent new homes, retail space and a basement car park, contributing to the creation of a vibrant and sustainable new neighbourhood.

Plot 14, Brent Cross Town, Barnet

Liverpool Waters
Mixed Use Regeneration

From Princes Dock to Hill Dickinson Stadium, Liverpool’s docklands regeneration is unlocking economic growth through new homes, commercial space, leisure facilities, and investment opportunities.

Liverpool Waters

Dalmarnock Purifier Studios, Glasgow
Workplaces

This project involves the redevelopment of a challenging brownfield site with poor ground conditions and significant contamination constraints. Early engagement with specialist piling contractors helped inform the design approach, improve cost certainty, and ensure the proposed solution was both practical and economically viable.

Dalmarnock Purifier Studios, Glasgow

Atlantic Park, Liverpool - Phase 1
Industrial & Logistics

A phased redevelopment of a historic industrial site, providing multi-discipline services. The project includes 800,000 sq ft of mixed-use space, innovative stormwater management, and complex in-situ groundwater remediation of TCE contamination, coordinated alongside live construction and supported by detailed environmental assessments and regulatory engagement.

Atlantic Park, Liverpool

Mallory & Irvine Buildings
Workplaces

An award-winning office development totalling approximately 150,000 sq ft, delivered as part of the first phase of the town centre regeneration for Birkenhead. The two buildings reflect the significant investment, providing an anchor project and a catalyst for Birkenhead’s new business & commercial district, blending modern design and environmental efficiency with a strong social impact.

Mallory & Irvine Buildings, Wirral

Copper Square, Brent Cross Town, Barnet
Mixed Use Regeneration

A flagship office building within Brent Cross Town and a landmark example of Modern Methods of Construction, the scheme was delivered through close collaboration between multiple stakeholders. It stands as one of Europe’s tallest hybrid structures, combining precast concrete, structural steel, composite beams, and cross‑laminated timber (CLT).

4 Arbour Street, Copper Square, Brent Cross

Contact Our Offices

Let’s talk about your next project and how our experienced team can help

Find your nearest Curtins office

Contact our Team